Other Works:
has been involved on special projects including construction of Bridges, conditions Survey of Structures/Buildings, Rehabilitation of Jetty.
- Construction of Bridge for ADB-Provincial Highways Project, at Badin-Sujawal Road.
- Concrete Sampling and Testing For Condition Assessment at Dry Dock-1, Dry Dock-2 and North Quay Wall, Karachi Shipyard. (Consultant: Inros Lackner ag/ A.A. Associates)
- Determination of Depth of Sheet Pile Wall along North Quay Wall Karachi Shipyard & Engineering Works Ltd.
- Evaluation of strength of existing structure at Silk Bank Boat Basin, Clifton, Karachi.
- Evaluation of Condition and Suggestions On Repair Work for Faiz Mahal, Khairpur & White House, Kot Diji.
- Rehabilitation & Refurbishment Work, Service Jetty and Marginal Wharf at Port Qasim, Karachi.(Association with Indusmens Corporation).
- Condition Survey for Assessment of Structure Stability for Pioneer Cement Plant.
